Load-In Dock Gate Pass Afteruse Receipt
A one-night load-in dock gate pass resurfaces when a sponsor courier wants to treat it as clean authority for later equipment custody, performer access, and archive transfer.
The pass is playable pressure only after the old pass, original load-in window, dock steward, requested afteruse, changed equipment, injured runner, and future route consumer are all visible. It is not a fixed-turn trigger and not a count target.
The player can certify the pass as original-window-only, attach the dock steward bridge, split equipment custody from performer access, reopen the injured runner claim, publish a load-out change notice, quarantine the pass afteruse, or let the false default stand. Future routes must remember which branch was chosen.