Caption Latency Debt / 字幕延迟债线
A caption row can arrive late enough that a reader relied on the wrong broadcast reality. The debt is not solved by publishing any caption; it must preserve which caption row was late or edited, who relied on it, what proof bridge exists, and which future route consumes the repair.
Playable pressure
- A live, mirror, archive, sponsor, lawful, fan-public, or editor-checksum surface creates reliance.
- The caption is late, altered, sponsor-safe, lawful-only, missing, or split.
- A harmed reader asks for repair before a future route consumes the caption state.
Branch families
public_recaption_receipt: public relief, handler burden, future public route repaired.lawful_annex_caption: lawful annex relief, public distrust cost, future appeal narrowed.sponsor_safe_caption_patch: sponsor stability relief, access/fan cost, sponsor-only route lock.editor_checksum_caption: edit proof relief, source ambiguity/edit debt cost.split_caption_relay: two reader surfaces preserved, archive debt and routing cost.suppress_caption_gap: false clean caption claim, recovery-only or blocked future route.
No branch is a universal clean caption repair.
When a completed repair receipt is later cited for a different caption version or broadcast cut, continue into Caption Delay Afteruse Receipt rather than reopening this first-repair line generically.